Fabrication data

Provide Gerber or ODB++ data, drill files, board outline, stack-up, material, copper weight, surface finish, impedance requirements, panel preferences and fabrication notes.

Bill of materials

Include reference designators, quantity, manufacturer, exact part number, package, description and approved alternatives. Mark do-not-fit positions and customer-supplied items clearly.

Assembly data

Provide centroid or pick-and-place data, assembly drawings, polarity markings, special handling notes and any programming or serialization requirements.

Testing and acceptance

State workmanship class, inspection requirements, functional-test procedure, pass/fail limits, fixture ownership and required records.

Commercial context

Include prototype or production stage, order quantity, forecast, target date, delivery destination, incoterm needs and whether an NDA is required before detailed files are exchanged.

RFQ handoff table: file, owner and release check

InputUsually prepared byCheck before sending
Fabrication packagePCB designerGerber/ODB++, drills, outline, stack-up and drawing share a revision
BOMEngineering / purchasingExact MPNs, quantities, reference designators, DNP and alternates
Placement dataPCB designerUnits, origin, side and rotation agree with assembly drawings
Programming / testProduct or test engineeringFirmware version, sequence, limits and fixture responsibility
Commercial briefBuyer / project ownerBatch quantity, forecast, destination and required date

Download a reusable RFQ brief

Download the PCB / PCBA RFQ template (.txt). Fill in the known items, mark unresolved points and attach your released design files separately.

If you export from KiCad, use the official PCB Editor documentation for fabrication and placement outputs, then verify the exported files before release.

Choose the quotation checklist for your order scope

Only purchasing unpopulated boards? Use the PCB fabrication file and stack-up checklist; a BOM and placement file are not general bare-board requirements. For a populated assembly, keep the complete assembly package above. Then use the same-scope quotation worksheet and lead-time gates to compare cost and timing without mixing exclusions or revisions.

Technical references

Use the applicable standard revision and the component manufacturer's documentation when defining your requirements.

Use this guide in your next build review

Share the current revision, pilot result, expected batch size and unresolved risks. We will identify the information needed before quotation or production release.

Prepare an RFQ