Quality Control Built Into Every Stage
Quality begins with an approved build package and follows the product through material, process, inspection, test and final release.
Quality planning
Define acceptance before production
The customer drawing and released build package remain the primary requirements. Workmanship class, inspection coverage, electrical testing, records and nonconformance handling are agreed before material commitment.
- Revision-controlled production files
- Approved BOM and substitution rules
- First-article and process verification
- Risk-based inspection and test coverage
- Controlled rework and mandatory retest
- Records retained to the agreed scope

Quality stages
Five gates from material to shipment
- 01
Incoming inspection
Verify identity, condition and handling requirements.
- 02
Process inspection
Confirm setup, first article and in-process controls.
- 03
Electrical testing
Screen bare boards or assemblies by agreed method.
- 04
Assembly inspection
Check visible and hidden solder features by risk.
- 05
Final inspection
Verify configuration, records, labeling and packaging.
| Quality stage | What is checked | Typical evidence |
|---|---|---|
| Incoming inspection | PCB and component identity, condition, quantity and handling status | Receiving record and exception disposition by scope |
| Process inspection | Stencil, program, profile, first article and work-in-process status | Setup or first-article record by scope |
| Electrical testing | Bare-board continuity or assembly structural/functional behavior | Test result or summary by agreed plan |
| Assembly inspection | Placement, polarity, visible joints and hidden joints where required | Visual, AOI or X-ray record by scope |
| Final inspection | Revision, workmanship, labels, quantity, documentation and packaging | Release checklist and shipment record |
Inspection & testing matrix
Use the method that can detect the risk
| Method | Best used for | Important limitation |
|---|---|---|
| SPI | Solder-paste volume and deposition before placement | Does not prove component placement or electrical function |
| AOI | Visible placement, polarity and solder-joint conditions | Cannot fully see joints beneath bottom-terminated packages |
| X-ray | BGA, QFN and other hidden solder features | Coverage and acceptance criteria must be defined |
| Bare-board electrical test | PCB opens and shorts before assembly | Does not validate assembled product behavior |
| ICT / flying probe | Structural electrical faults where test access permits | Coverage depends on design access and economics |
| Functional test | Product behavior against defined inputs and outputs | Requires customer-defined procedure, limits and interfaces |
Certification status
Verify current documents before supplier approval
Certification status can change and scope matters. Request the current certificate pack, certificate number, issuing body, expiry date and covered site directly from our sales team. This website does not present planned certifications as completed.
Request current documentsStandards
Project requirements take precedence
Reference standards and workmanship classes should be stated on the purchase order or quality agreement. Regulated or safety-critical products require additional qualification and are accepted only after documented review.
Your purchasing decision
What should a project quality plan actually specify?
Agree the inputs, acceptance decisions and required records before comparing quotations. The table below is a planning checklist, not a claim that every order includes every test or document.
| Decision | Buyer defines | Confirm in the agreed build plan |
|---|---|---|
| Acceptance requirements | Drawing revision, workmanship criteria and critical characteristics | Applicable revision, exceptions and the authority to approve changes |
| First article | What must be approved before the remaining batch proceeds | Sample scope, review point, approver and handling of an unresolved issue |
| Inspection versus function | Faults that matter and product behavior to verify | Inspection coverage, test procedure, access, measured limits and excluded checks |
| Failed or repaired units | Disposition owner and any repair restrictions | Quarantine, authorized rework, retest and traceable status |
| Shipment release | Required records, labels, packaging and retention period | Pass/fail summary, unresolved deviations and final release responsibility |
Need to choose a method first? Compare inspection and electrical/functional testing. For assembly feasibility, review SMT inputs and the DFM worksheet. These resources do not replace an approved project specification.
Start with your actual project
Project quality and acceptance plan
Use the enquiry form to describe the decision you need help with. We select the relevant project context; you remain in control of the details.
- Released drawings and applicable acceptance requirements
- Critical faults, test access and pass/fail limits
- First-article approval, rework, retest and release records
Inspection activity is not complete fault coverage. Agree methods, limits, excluded checks and release responsibility before ordering.
Request this reviewNext step
Define the quality plan before quotation
Tell us the workmanship class, inspection coverage, test requirements, record retention and regulatory constraints that apply to your project.