Verified quality

Quality Control Built Into Every Stage

Quality begins with an approved build package and follows the product through material, process, inspection, test and final release.

Quality planning

Define acceptance before production

The customer drawing and released build package remain the primary requirements. Workmanship class, inspection coverage, electrical testing, records and nonconformance handling are agreed before material commitment.

  • Revision-controlled production files
  • Approved BOM and substitution rules
  • First-article and process verification
  • Risk-based inspection and test coverage
  • Controlled rework and mandatory retest
  • Records retained to the agreed scope
Automated optical inspection verifying a PCB assembly
Inspection method is selected according to visibility, access and product risk.

Quality stages

Five gates from material to shipment

  1. 01

    Incoming inspection

    Verify identity, condition and handling requirements.

  2. 02

    Process inspection

    Confirm setup, first article and in-process controls.

  3. 03

    Electrical testing

    Screen bare boards or assemblies by agreed method.

  4. 04

    Assembly inspection

    Check visible and hidden solder features by risk.

  5. 05

    Final inspection

    Verify configuration, records, labeling and packaging.

Quality stageWhat is checkedTypical evidence
Incoming inspectionPCB and component identity, condition, quantity and handling statusReceiving record and exception disposition by scope
Process inspectionStencil, program, profile, first article and work-in-process statusSetup or first-article record by scope
Electrical testingBare-board continuity or assembly structural/functional behaviorTest result or summary by agreed plan
Assembly inspectionPlacement, polarity, visible joints and hidden joints where requiredVisual, AOI or X-ray record by scope
Final inspectionRevision, workmanship, labels, quantity, documentation and packagingRelease checklist and shipment record

Inspection & testing matrix

Use the method that can detect the risk

MethodBest used forImportant limitation
SPISolder-paste volume and deposition before placementDoes not prove component placement or electrical function
AOIVisible placement, polarity and solder-joint conditionsCannot fully see joints beneath bottom-terminated packages
X-rayBGA, QFN and other hidden solder featuresCoverage and acceptance criteria must be defined
Bare-board electrical testPCB opens and shorts before assemblyDoes not validate assembled product behavior
ICT / flying probeStructural electrical faults where test access permitsCoverage depends on design access and economics
Functional testProduct behavior against defined inputs and outputsRequires customer-defined procedure, limits and interfaces

Certification status

Verify current documents before supplier approval

Certification status can change and scope matters. Request the current certificate pack, certificate number, issuing body, expiry date and covered site directly from our sales team. This website does not present planned certifications as completed.

Request current documents

Standards

Project requirements take precedence

Reference standards and workmanship classes should be stated on the purchase order or quality agreement. Regulated or safety-critical products require additional qualification and are accepted only after documented review.

Your purchasing decision

What should a project quality plan actually specify?

Agree the inputs, acceptance decisions and required records before comparing quotations. The table below is a planning checklist, not a claim that every order includes every test or document.

DecisionBuyer definesConfirm in the agreed build plan
Acceptance requirementsDrawing revision, workmanship criteria and critical characteristicsApplicable revision, exceptions and the authority to approve changes
First articleWhat must be approved before the remaining batch proceedsSample scope, review point, approver and handling of an unresolved issue
Inspection versus functionFaults that matter and product behavior to verifyInspection coverage, test procedure, access, measured limits and excluded checks
Failed or repaired unitsDisposition owner and any repair restrictionsQuarantine, authorized rework, retest and traceable status
Shipment releaseRequired records, labels, packaging and retention periodPass/fail summary, unresolved deviations and final release responsibility

Need to choose a method first? Compare inspection and electrical/functional testing. For assembly feasibility, review SMT inputs and the DFM worksheet. These resources do not replace an approved project specification.

Start with your actual project

Project quality and acceptance plan

Use the enquiry form to describe the decision you need help with. We select the relevant project context; you remain in control of the details.

  • Released drawings and applicable acceptance requirements
  • Critical faults, test access and pass/fail limits
  • First-article approval, rework, retest and release records

Inspection activity is not complete fault coverage. Agree methods, limits, excluded checks and release responsibility before ordering.

Request this review

Next step

Define the quality plan before quotation

Tell us the workmanship class, inspection coverage, test requirements, record retention and regulatory constraints that apply to your project.