VeriPCB — Consigned / hybrid PCB assembly kit handoff Version: 2026-10-05 Guide: https://veripcb.com/guide-turnkey-vs-consigned-pcba Contact: andy@reach.veripcb.com Planning checklist only. It is not a fixed loss allowance, warranty or contract. Confirm all applicable rules in the project quotation or quality agreement. Project / PCB / BOM revision: Customer purchasing owner / engineering approver: Assembler receiving / release owner: Quantity / required arrival date / destination: Customer-supplied BOM lines / assembler-purchased BOM lines: For each supplied BOM line: - Exact manufacturer / MPN / reference designators / DNP: - Required quantity / supplied quantity / agreed spare quantity: - Approved source and required lot/date/source identification: - Packaging / ESD / moisture / reflow / shelf-life restrictions: - Programmed image/version or configuration (if applicable): - Receipt count method and discrepancy notification: Agree before shipment: 1. Attrition allowance by line, consumed/remaining balance and shortage cost owner. 2. Quarantine and disposition of incorrect, suspect or defective incoming material. 3. Shortage options: hold / replenish / approved purchase / split build. 4. Alternate approval owner; cost and schedule changes must be authorized. 5. Investigation and cost rules for incoming defects, process damage and design failures. 6. Workmanship inspection versus functional test; firmware, fixture, limits and records. 7. Remaining-stock ownership, storage period, return packaging, freight and timing. 8. Disposal or rework only with the designated written authorization. Release gates: Scope approved -> kit plan approved -> receipt reconciled -> first article released -> build / agreed tests closed -> material balance and shipment authorized. Open decision / evidence needed / owner / due date: Approved scope and responsibility agreement reference: Do not guess unknown rules. Sending this checklist is an enquiry, not an order.